Product Details:
|
Cable: | 1 Cable Hole / Power Supply | Humidity Range: | 20%~98%R.H.(10%~98%R.H/ 5%~98%R.H) |
---|---|---|---|
Cooling Rate: | 0.7c~1.0c/Min (Average) | Brand: | GSKA |
Keyword: | Thermal Cycle Test Chamber | Controller: | Programmable LCD Touch Screen Casters |
Chamber Materials: | SUS#304 Stainless Steel For Internal Chamber | Test Time: | 1~9999 Minutes(arbitrary Setting) |
High Light: | Temperature Test Chamber,Climate Test Chamber |
ROHS Antiwear Thermal Cycling Test Equipment LCD Temperature Test Chamber
Thermal shock test chamber application:
Two Zone Thermal shock test chamber is usd to test the capability of material structure or composite materials to withstand the continuous Environmental changes between extremely high temperature and low temperature during a short period,and therefore understand the chemical changes or physical damages caused by expansion from heat and contraction from cold in the shortest possible time.It is applicable to metals,plastic,rubber,electronics amongst other materials.
Features:
1. Highly accurate temperature recovery
2.1000 cycles continuous operation (option: defrost-free operation)
3. Accurate and dependable test result (option: product temperature control*)
4. Monitoring product temperature (option: product temperature monitor with trigger function)
5. patent parallel refrigeration system improves reliability
6. Automatic setting of pre-cooling and pre-heating in energy saving, Eco operation mode
Additional functions:
Timer, over temperature and power failure protection, alarm, record test curve, emergency stop, display test time
Circulated cooling water: pressure: 0.2~0.4MPa, temperature: ≤30℃
Standard configuration: indication lamp of test chamber, time meter, test hole for wire routing, 6pcs castor, 4pcs adjust wheel.
Product Specifications:
Inner size WxHxD(cm) | 36×40×35 | 40×50×40 | 50×60×50 | 60×75×50 | 80×85×60 |
External size WxHxD(cm) | 138x180x155 | 150X190X160 | 190x200X195 | 210x220X205 | 225x250x220 |
Shock Temperature ragne | -65°C~150°C | ||||
Heating up time | RT~200°C about 35min | ||||
Cooling down time | RT~-70°C about 75min | ||||
Temp recover time/change time | ≤5min / ≤10sec | ||||
Temp control accuracy/ distribution accuracy |
±0.5°C / ±2.0°C | ||||
Cooling systems | Semi-hermetic two-stage compressor (water-cooled) / hermetic two-stage compressor (air-cooled). |
||||
Safety devices | Fuse switch, high and low pressure protection switch compressors, refrigerant pressure protection switch failure warning system, electronic siren. |
||||
Inner materials | SUS 304# stainless steel plate for inner chamber,and stainless steel plate + spray painting for external chamber. |
||||
Systems | P.I.D+S.S.R+Microcomputer balanced temperature control system. | ||||
Insulation materials | High-temperature high-density amino acid ethyl ester foam insulator material. | ||||
Fitting | Outlook window (special purchase), the upper and lower adjustable compartment two energized measured line hole, casters,level bracket. |
GB/Bb T2423.2-89 high temperature test method GB2423.1-89 test A: low temperature test method 6
Ab IEC60068-2-1 low temperature test method GJB150.4-1986 test at low temperature
EIA - 364-59 test at low temperature IEC60068-2-38 temperature cycle
IEC60068-2-78 constant temperature IEC60068-2-30 temperature cycle
EIA - 364-31C temp resistance GB/T2423.3 constant heat test method
We keep good quality and competitive price to ensure our customers benefit ; We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from. Each batch of parts is done quality sampling inspection before into the warehouse, and Each product before delivery is tested by the national authoritative third-party inspection agency
Customer Support Services:
Ø Installation
Ø Training (Training customer employees)
Ø Calibration
Ø Preventative maintenance
Ø Replacement parts
Ø Assistance via phone or internet
Contact Person: Ms. Kris Zhang
Tel: 0086-0769-85914911